Bangalore metro Phase 1: Complete Guide to Route map, Lines, Stations

0
408

Introduction

The Bangalore Metro Phase 1, also known as Namma Metro Phase 1, marks a significant advancement in Bengaluru’s urban transport infrastructure. With its extensive network and modern features, Phase 1 has transformed the city’s public transportation system, addressing critical issues like traffic congestion and pollution. This article provides a comprehensive overview of Bangalore Metro Phase 1, including its construction, routes, and historical milestones.

Phase 1 Information

Construction Timeline and Inauguration

Construction of Bangalore Metro Phase 1 commenced in April 2007, laying the groundwork for a modern transit system designed to cater to the city’s burgeoning population. The first section, connecting Baiyyappanahalli to MG Road on the Purple Line, was inaugurated in 2011. The final segment of the project was inaugurated by the President on June 17, 2017, with commercial operations commencing the following day.

Bangalore Metro Phase 1: Route

Project Details

  • Launch Date: The first phase of the Namma Metro, Phase 1, was inaugurated on October 20, 2011.
  • Total Length: Approximately 42.3 kilometers.
  • Lines: The phase comprises two main lines:
    • Purple Line: Connecting Baiyappanahalli to Mysore Road.
    • Green Line: Connecting Nagasandra to Yelachenahalli.
  • Stations: 40 stations across both lines.

Bangalore Metro Phase 1 lines:

1. Bangalore metro Purple Line – Baiyyappanahalli to Mysore Road

  • Length: 18.10 km
  • Type: Elevated and Underground (4.8 km)
  • Depot: Baiyappanahalli
  • Number of Stations: 17
Purple Line Stations

Purple Line Stations (Baiyyappanahalli to Mysore Road)

Serial Number Station Name
1 Baiyyappanahalli
2 Indiranagar
3 Halasuru
4 Trinity
5 MG Road
6 Cubbon Park
7 Vidhana Soudha
8 Sir M. Visvesvaraya
9 Majestic
10 City Railway Station
11 Magadi Road
12 Hosahalli
13 Vijayanagar
14 Attiguppe
15 Deepanjali Nagar
16 Mysore Road
17 Swami Vivekananda Road

2. Bangalore Metro Green Line – Nagasandra to Yelachenahalli

  • Length: 24.20 km
  • Type: Elevated and Underground (4 km)
  • Depot: Peenya
  • Number of Stations: 24
Green Line Stations

Green Line Stations (Nagasandra to Yelachenahalli)

Serial Number Station Name
1 Nagasandra
2 Dasarahalli
3 Jalahalli
4 Peenya Industry
5 Peenya
6 Goraguntepalya
7 Yeshwanthpur
8 Sandal Soap Factory
9 Mahalaxmi
10 Rajajinagar
11 Kuvempu Road
12 Srirampura
13 Sampige Road
14 Majestic
15 Chickpet
16 KR Market
17 National College
18 Lalbagh
19 Southend Circle
20 Jayanagar
21 Yelachenahalli (formerly Puttenahalli)

Bangalore Namma metro: Tenders and Contracts

Detailed information about tenders for Bangalore Metro Phase 1, including bidders and contracts, can be accessed on the BMRCL’s official website. This section covers news and updates related to construction and procurement.

Namma metro phase 1: Historical Milestones

Here’s a timeline of key dates marking the completion of various sections in Phase 1:

Metro Line Table
Date Section Line Distance
20 Oct 2011 Baiyyappanahalli to MG Road Purple Line 6.7 km
01 Mar 2014 Sampige Road to Peenya Industry Green Line 9.9 km
01 May 2015 Peenya Industry to Nagasandra Green Line 2.5 km
16 Nov 2015 Mysore Road to Magadi Road Purple Line 6.4 km
29 Apr 2016 MG Road to Magadi Road Purple Line 4.8 km
19 June 2017 Sampige Road to Yelachenahalli Green Line 12 km

Also read: Bangalore Metro Route: Gree, pink, yellow, Blue, Purple and Orange line, timings, stations 2024


Bangalore Metro Phase 1: Route map

Impact and Benefits: Namma metro phase 1

Enhanced Urban Mobility

Bangalore Metro Phase 1 has revolutionized urban mobility by providing a fast, reliable, and efficient mode of transportation. The Namma metro system helps reduce travel time, ease traffic congestion, and improve overall quality of life for residents.

Economic and Environmental Advantages

  • Economic Growth: The metro system has spurred economic development along its routes, boosting local businesses and creating job opportunities.
  • Environmental Benefits: By promoting public transport usage, Phase 1 contributes to lower pollution levels and a reduction in the city’s carbon footprint.

Future Prospects

The success of Bangalore Metro Phase 1 has set the stage for future expansions. The ongoing development of Phase 2 and beyond aims to extend the metro network, enhance connectivity, and integrate with other transportation systems, further transforming Bengaluru into a model of modern urban transit.

Conclusion

Bangalore Metro Phase 1 stands as a landmark achievement in urban infrastructure, offering significant benefits in terms of mobility, economic growth, and environmental sustainability. As the metro network continues to expand, Bengaluru is poised to enjoy even greater advancements in public transportation, paving the way for a more connected and sustainable future

Frequetnly Asked Questions:

1. When did construction for Phase 1 begin and complete?

Construction for Bangalore Metro Phase 1 began in April 2007. The first section was inaugurated on October 20, 2011, and the final segment was opened on June 17, 2017

2. What are the key features of the Purple Line?

The Purple Line extends from Baiyyappanahalli to Mysore Road, covering a distance of 18.10 km. It includes both elevated and underground sections, with a total of 17 stations. Key stations include Baiyyappanahalli, MG Road, and Mysore Road

3. What is Bangalore Metro Phase 1?

Bangalore Metro Phase 1, also known as Namma Metro Phase 1, is an urban transit system in Bengaluru. It features two main lines, the Purple Line and the Green Line, spanning a total of 42.3 kilometers. This phase has significantly improved urban mobility and reduced traffic congestion in the city

4. How has Bangalore Metro Phase 1 impacted the city?

Phase 1 has revolutionized urban mobility by providing a reliable and efficient mode of transportation, reducing travel time, easing traffic congestion, and improving overall quality of life. Economically, it has spurred local development and job creation

5. What are the future plans for Bangalore Metro?

Future expansions include the development of Phase 2 and beyond, aimed at extending the metro network, enhancing connectivity, and integrating with other transportation systems to further transform Bengaluru’s urban transit landscape

Suggested Articles:

Bangalore Metro Route: Gree, pink, yellow, Blue, Purple and Orange line, timings, stations 2024

New Bengaluru Metro Yellow Line: Stations, Operating Hours, and Economic Impact”

Bengaluru’s Namma Metro Map-Routes, Fares & Timings

LEAVE A REPLY

Please enter your comment!
Please enter your name here